CHN ENERGY Taizhou Power Generation Co., Ltd. Intelligent Upgrade Project for Smart Power Plant
Project Overview
Against the national goals of carbon peaking and carbon neutrality, CHN ENERGY Taizhou Power Generation Co., Ltd. — a key energy enterprise in Jiangsu Province — partnered with Guangzhou GZZHYUN Technology Co., Ltd. to carry out intelligent upgrading of its conference and monitoring systems.
GZZHYUN provided a custom 17.3-inch motorized lift terminal solution featuring high stability, energy-saving design, and efficient data transmission. The project greatly improved operational monitoring efficiency, optimized resource allocation, and supported green, low-carbon development, setting a new benchmark for smart power plant construction.

Project Background
As one of the largest thermal power enterprises in Jiangsu Province, CHN ENERGY Taizhou Power Generation boasts a coal-fired installed capacity of 4,000,000 kW. To pursue safer, more efficient, and low-carbon operations, the company planned to:
- Improve real-time production monitoring and equipment management
- Enhance data analysis and operational decision-making efficiency
- Reduce energy consumption and support carbon reduction targets
- Build a standardized, intelligent, and modern power plant
With rich experience in intelligent hardware and system integration, GZZHYUN became the trusted partner for this intelligent transformation.

Core Solution & Product Highlights
Custom 17.3-Inch Motorized Lift Terminal
- High-Precision Customization. Custom-designed dimensions, structure, and materials to adapt to the complex and demanding environment of power plants, ensuring stable and reliable long-term operation.
- Intelligent Lifting Control. Supports central control, remote control, and physical button control for flexible and precise adjustment, improving the convenience of monitoring and command.
- High-Definition Multimedia Interface. Equipped with 1×VGA, 1×HDMI, and 2×USB data transmission ports to support high-definition screen display and real-time data sharing for stable monitoring and analysis.
- Green & Energy-Saving Technology. Adopts WLED backlight with long service life, low power consumption, and environmental protection, fully aligning with the company’s green development strategy.



Project Outcomes & Values
1. Improved Monitoring Efficiency
High-definition display and convenient control enable operators to quickly detect anomalies, respond in a timely manner, and reduce potential safety risks.
2. Optimized Resource Allocation
Real-time data transmission and analysis support accurate operational scheduling, improved energy efficiency, and reduced operating costs.
3. Promoted Energy Saving & Emission Reduction
Energy-saving hardware design and efficient digital management help lower overall power consumption and support the “dual carbon” strategy.
4. Enhanced Intelligent Operation
Modernized intelligent equipment upgrades the corporate image and lays a solid foundation for future smart power plant expansion.